Current Project List
FOR THE 2025 YEAR
John Street Reconstruction
Scope includes a full reconstruction of underground services from Church Street to Pyne Street including water, storm, sanitary, road surface and restoration work. The cost is $1,200,000.
2025 Street Resurfacing Program
NORTH
1. Bannon Road - Pulverize & Pave - $ 200,000
2. Creaghan Avenue - Excavate & Pave - $ 155,000
3. Ledden Street - King George Highway to Fountain Head Lane - Asphalt Milling & Pave - $210,000
4. Tardy Avenue - Asphalt Milling & Pave - $ 165,000
5. Williston Road - Civic 277 to Civic 386 - Asphalt Milling & Pave - $230,000
SOUTH
1. Barrieau Street - Andrew St. to Raymond St. - Pulverize & Pave - $ 145,000
2. Bremner Drive - Cedar St. to LeBreton Dr. - Pulverize & Pave - $ 150,000
3. Wallace Road - Civic 30 to Civic 68 - Pulverize & Pave - $200,000
4. Water Street - St. Andrews St. to Civic 2762 - Asphalt Milling & Pave - $ 240,000
5. Water Street - Tozer Ave. to Civic 2706 - Pulverize & Pave - $305,000
The estimated total for the work above is $2,000,000
The City of Miramichi has 225 kilometers of roadway, not including the provincial designated highways. The Department of Engineering reviews and rates each street biannually utilizing software called Total Pave to analyze road conditions.
The selection process for asphalt paving incorporates several considerations which include but are not limited to:
PCI - pavement condition index
street designation
traffic volume
street condition
underground infrastructure condition
maintenance costs
street cross section and profile
PSAB 3150 and 3160 (asset management) compliance
Other (development considerations, planning, funding opportunities)